Special Project of the Washington State Convention Center

NEPA Draft EIS documents are now available. Learn More

Bid Packages

The preliminary procurement schedule is provided HERE.  WSCC's goal is to create an extraordinarily well thought out construction plan benefiting from a highly experienced GC/CM team of Clark/Lewis, a joint venture; a strong team of subcontractors; a lengthy preconstruction period; and, the convention center expertise of Seattle-based LMN Architects.  The project will be funded primarily by a bond issuance from the Convention Center supported by the existing tax on hotel rooms; no new taxes will be needed for the proposed Addition.  It is also anticipated that the project will include an Owner Controlled Insurance Policy. 

Overview of the Final Bid Packages followed by a Meet the Prime Subcontractors Session

Please join us for an overview of the final bid packages and to learn about opportunities for diverse businesses, followed by a Meet the Prime Subcontractors Session. The final bid packages will include the following scopes:

Masonry Stone Paving Waterproofing
Roofing Fireproofing Site Utilities
Metal Siding / Sheet Metal Retail Glazing Interior Glazing
Drywall Insulation Overhead Doors
Fire Curtains Operable Partitions Polished Concrete
Doors/Frames/Hardware Painting Acoustical Ceilings
Specialty Ceilings Food Service Tile
Resinous Flooring Resilient Floors / Carpet Terrazzo
Wood Flooring Casework Signage
Div. 10 Specialties Bird Control Window Washing
Window Treatments Parking Equipment; Site Concrete
Loading Dock Equipment Asphalt Paving Striping
Landscaping Miscellaneous Metals Fencing
Rough Carpentry    
When:    Tuesday, March 27, from 1:30 pm to 4 pm
Where:   Washington State Convention Center
               705 Pike Street, Room 2AB
               Seattle, WA 98101 

For directions, please see www.wscc.com/directions.  Please RSVP. Space is limited.

Past Bid Packages



Predetermination of Eligibility Packages

Clark/Lewis, a Joint Venture (“Clark/Lewis”), the General Contractor/Construction Manager (GCCM) for the Washington State Convention Center Addition project, has determined that this project meets the criteria established in RCW 39.10.400 for use of the pre-bid determination of subcontractor eligibility procedures. This project features complex new construction and build out with constrained sequencing, specific technical requirements as well as specific LEED goals and requirements. This project will also utilize BIM modeling collaboration and integrated project partnering techniques. 

Clark/Lewis is an equal opportunity employer and encourages bids from all subcontractors including minority, small, veteran, disadvantaged and women owned businesses.

Stay In Touch

Head to the Contact Page to sign up for our newsletter and never miss a thing!


Contracting Information

If you are a contractor or would like more information about the Washington State Convention Center Addition project, visit our Contracting page.

Learn More

Want More News?

Be sure to check our news section often, as we will update it consistently throughout the project.

Learn More

© Washington State Convention Center

WSCC.com Privacy Policy

Stay Informed

As momentum for the Addition project builds, this web site will grow, as well. Please sign up for general updates on the project or to keep your company informed about construction or service opportunities. Note that the sign up is specifically for news about the WSCC Addition project, rather than existing WSCC business.